首页> 外文期刊>Nuclear news >ASLB denies once-admitted contention
【24h】

ASLB denies once-admitted contention

机译:ASLB拒绝曾经承认的竞争

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

On June 30, the Atomic Safety and Licensing Board presiding over Progress Energy's license application for two new power reactors at the Harris site in North Carolina issued a memorandum and order reversing its earlier decision to admit a contention from an inter-venor. The decision left no admitted contentions, so there will not be a contested hearing on this application for combined construction and operating licenses (COL), only the mandatory hearing called for under 10 CFR Part 52, with no adversarial public involvement.rnThe contention, submitted by the North Carolina Waste Awareness and Reduction Network (NC-WARN), a citizen organization, asserted that the COL application was incomplete because it referred to Revision 16 of the design control document for the reactor model, Westinghouse's AP1000 pressurized water reactor. As part of the amendment approval process to replace the certified version of the AP1000 (Revision 15), Westinghouse's Revision 16 has now been supplanted by Revision 17.
机译:6月30日,原子能安全和许可委员会主持了Progress Energy在北卡罗来纳州哈里斯基地的两座新动力反应堆的许可申请,并发出了一项备忘录,并下令其先前的决定接受中间人的争议。该决定未引起任何争议,因此将不会就此建筑和运营许可证(COL)申请进行有争议的听证会,只有根据10 CFR Part 52要求进行的强制性听证会,没有对抗性的公众参与。一个公民组织北卡罗莱纳州废物意识和减少网络(NC-WARN)声称,COL应用程序不完整,因为它引用了反应堆模型(西屋公司的AP1000压水堆)设计控制文件的修订版16。作为替代AP1000认证版本(修订版15)的修订批准流程的一部分,西屋公司的修订版16现在已由修订版17取代。

著录项

  • 来源
    《Nuclear news》 |2009年第9期|1520-2224-2628|共8页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号