首页> 外文期刊>Nuclear news >Salt waste processing handled by ISDP
【24h】

Salt waste processing handled by ISDP

机译:ISDP处理的盐废物处理

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

An audit conducted by the Department of Energy's Inspector General (IG) has determined that a delay in the opening of the new Salt Waste Processing Facility (SWPF) at the Savannah River Site (SRS) will not have a negative impact on the interim treatment of radioactive salt waste. The findings of the May audit are summed up in the report, The Interim Treatment of Salt Waste at the Savannah River Site, which is available online at.rnThe report explains that on December 8, 2008, the DOE named Savannah River Remediation LLC as the contractor to manage radioactive liquid waste operations at SRS. Savannah River Remediation was to take action to treat and dispose of waste stored in underground storage tanks and to operate and maintain the equipment and facilities that make up the liquid waste management system.
机译:能源部监察长(IG)进行的审核已确定,萨凡纳河站点(SRS)的新盐废物处理设施(SWPF)的开放延迟不会对垃圾处理厂的临时处理产生负面影响放射性盐废物。该报告解释说,2008年12月8日,美国能源部将Savannah River Remediation LLC命名为Savannah River Remediation LLC,该报告总结了5月审核的结果。承包商管理SRS的放射性液体废物运营。萨凡纳河整治将采取行动,处理和处置地下储罐中的废物,并操作和维护构成液体废物管理系统的设备和设施。

著录项

  • 来源
    《Nuclear news》 |2010年第8期|P.56-58|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号