首页> 外文期刊>Nuclear news >Fuel channel replacement completed at Wolsong
【24h】

Fuel channel replacement completed at Wolsong

机译:伍尔松燃料通道更换完成

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Atomic Energy of Canada Limited on December 1,2010, announced the completion of operations to remove and replace the calandria tubes, pressure tubes, and end fittings of the Wolsong-1 CANDU 6 plant, which is operated by Korea Hydro & Nuclear Power Company (KHNP). "This success marks the first time a CANDU 6 reactor has had all of the [380] fuel channels removed and replaced," said Hugh MacDiarmid, president and chief executive officer of AECL. This completes the most critical part of the Wolsong reactor renovation program, which began in June 2009. The next stage of the project is to remove the multiton tooling systems used to perform the operations and the work platforms supporting them before beginning the feeder installation.
机译:加拿大原子能有限公司于2010年12月1日宣布,已完成拆除和更换Wolsong-1 CANDU 6工厂的排汽管,压力管和末端配件的操作,该工厂由韩国水电和核电公司( KHNP)。 AECL总裁兼首席执行官休·麦克迪米德(Hugh MacDiarmid)说:“这一成功标志着CANDU 6反应堆首次将所有[380]个燃料通道拆除和更换。”这完成了始于2009年6月的Wolsong反应堆翻新计划的最关键部分。该项目的下一个阶段是,在开始安装进料器之前,删除用于执行操作的多级工装系统和支持它们的工作平台。

著录项

  • 来源
    《Nuclear news》 |2011年第1期|p.37|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号