...
首页> 外文期刊>Nuclear news >Emergency plan, wet-bulb exemption addressed
【24h】

Emergency plan, wet-bulb exemption addressed

机译:应急计划,湿球豁免得到解决

获取原文
获取原文并翻译 | 示例

摘要

Southern Nuclear Operating Company's Vogtle-3 and -4 are the first of the Wes-tinghouse-design AP1000 pressurized water reactors in the queue for combined construction and operating licenses (COL), and under the Nuclear Regulatory Commission's design-centered approach to the licensing of standard-design reactors, this makes Vogtle the reference COL application (R-COL). The other six AP1000 licensing candidates are thus considered subsequent COL applications (S-COL). The technical reviews for most of the S-COLs are well behind Vogtle's, but one S-COL-for the second and third reactors at the Summer sie in South Carolina-is almost even with Vogtle, with two key matters having been addressed by the NRC staff in November.
机译:南部核运营公司的Vogtle-3和-4是Wes-househouse设计的AP1000压水堆中的第一个,该队列排在了同时获得建设和运营许可证(COL)的情况下,并且是在核监管委员会以设计为中心的许可方法下进行的在标准设计的反应堆中,Vogtle成为了参考COL应用程序(R-COL)。因此,其他六个AP1000许可候选者被视为后续的COL申请(S-COL)。大多数S-COL的技术审查都远远落后于Vogtle的技术审查,但南卡罗来纳州Summer sie的第二和第三反应堆的一个S-COL几乎与Vogtle一样,其中两个关键问题已由Vogtle处理。 NRC工作人员在11月。

著录项

  • 来源
    《Nuclear news 》 |2011年第1期| p.30-31| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号