首页> 外文期刊>Nuclear news >Entering the era of new-reactor construction inspection
【24h】

Entering the era of new-reactor construction inspection

机译:进入新反应堆施工检查时代

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

For roughly three years, the Nuclear Regulatory Commission has been preparing for this. A new kind of reactor licensing under 10 CFR Part 52 made it necessary to develop a new kind of project oversight. The Construction Reactor Oversight Process (cROP), under which the NRC will assess regulatory compliance as a reactor is being built, is now in place and is being used to oversee the construction of Southern Nuclear Operating Company's Vogtle-3 and -4 and SCANA/Santee Cooper's Summer-2 and -3.
机译:大约三年来,核监管委员会一直在为此做准备。根据10 CFR第52部分获得的新型反应堆许可使得有必要进行新型的项目监督。 NRC将根据建造反应堆的监督程序(cROP)评估反应堆的建造情况,该程序现已到位,并用于监督南方核电运营公司Vogtle-3和-4和SCANA / Santee Cooper的Summer-2和-3。

著录项

  • 来源
    《Nuclear news》 |2012年第7期|p.52-54|共3页
  • 作者

    E. Michael Blake;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号