While the industry awaits the Nuclear Regulatory Commission's issuance of combined construction and operating licenses (COL) for new plant construction at the Vogtle site in Georgia and the Summer site in South Carolina, activities are continuing in other segments of the industry. At the Hanford Site, work is under way, under contractor Bechtel National Inc., on the Department of Energy's $12-billion Waste Treatment and Immobilization Plant, which will be the largest radioactive waste treatment plant in the world. Currently, about 3300 people are working on the project, which is to be commissioned in 2019 and at full operation by 2022.
机译:在行业等待核监管委员会为乔治亚州的Vogtle站点和南卡罗来纳州的Summer站点的新工厂建设发布联合建造和运营许可证(COL)的同时,该行业其他领域的活动仍在继续。在汉福德基地,承包商贝克特国家公司(Bechtel National Inc.)正在建设能源部耗资120亿美元的废物处理和固定化工厂,该工厂将成为世界上最大的放射性废物处理工厂。目前,该项目的工作人员约为3300人,该项目将于2019年投入使用,并于2022年全面投入运营。

著录项

  • 来源
    《Nuclear news》 |2012年第2期|p.4|共1页
  • 作者

    Betsy Tompkins;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号