...
首页> 外文期刊>Nuclear news >Security Briefs
【24h】

Security Briefs

机译:安全摘要

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The nrc has proposed a $17,500 fine against zionsolutions for security-related violations at the Zion nuclear power plant, which is in the process of being decommissioned. On May 28, the Nuclear Regulatory Commission issued ZionSolutions a notice of violation and proposed imposition of civil penalty, characterizing the licensee-identified violations as a Severity Level Ⅲ problem. While conceding that ZionSolutions has acted to address the violations, the NRC concluded that the fine was necessary in order "to emphasize the importance of taking prompt and comprehensive corrective actions," according to an NRC press release. The facility license for the Zion plant was transferred from Exelon to ZionSolutions in September 2010 to expedite the decommissioning process. The plant was permanently shut down in February 1998.
机译:NRC提议对Zionsolutions处以$ 17,500的罚款,原因是Zionsolutions正在进行退役,原因是Zion核电厂的安全相关违规行为。 5月28日,核监管委员会向ZionSolutions发布了违规通知,并建议实施民事处罚,将被许可方确定的违规行为定为严重性为Ⅲ级的问题。根据NRC新闻稿,NRC承认ZionSolutions已采取行动解决违规问题,但得出结论认为,罚款是必要的,以便“强调采取迅速和全面的纠正措施的重要性”。锡安工厂的设施许可证已于2010年9月从Exelon移交给ZionSolutions,以加快退役过程。该工厂于1998年2月永久关闭。

著录项

  • 来源
    《Nuclear news》 |2014年第8期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号