...
【24h】

Late News

机译:最新消息

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

August 31, the company filed a recommendation with the Georgia Public Service Commission (PSC) to continue the construction of the two AP1000 reactors at the Vogtle site near Augusta, Ga. According to a Georgia Power press release, based on the results of a comprehensive schedule, cost-to-complete, and cancellation assessment, the company has concluded that completing both AP1000 reactors represents the "most economic choice for customers and preserves the benefits of carbon-free baseload generation." Georgia Power, a subsidiary of Southern Company, expects Vogtle-3 and -4 to begin commercial operation in November 2021 and November 2022, respectively.
机译:8月31日,该公司向佐治亚州公共服务委员会(PSC)提出了一项建议,继续在佐治亚州奥古斯塔附近的Vogtle场址上建造两个AP1000反应堆。根据佐治亚州电力公司的新闻稿,综合结果在时间表,完成成本和取消评估方面,该公司得出的结论是,完成两台AP1000反应堆都是“客户最经济的选择,并保留了无碳基负荷发电的好处”。南方公司的子公司佐治亚州电力公司预计Vogtle-3和-4分别于2021年11月和2022年11月开始商业运营。

著录项

  • 来源
    《Nuclear news》 |2017年第10期|17-21|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号