【24h】

Late News

机译:最新消息

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

TVA IS BEING SUED BY NUCLEAR DEVELOPMENT LLC over its decision to pull the plug on the sale of its Bellefonte plant. The Tennessee Valley Authority had agreed in November 2016 to sell the unfinished nuclear facility, near Hollywood, Ala., to Nuclear Development for $111 million and to close the deal in November 2018 (NN, Dec. 2016, p. 21). According to Nuclear Development's complaint, just days before the November 14 closing date, TVA raised an unexpected issue, claiming that under Section 101 of the Atomic Energy Act, before the sale can be completed, the Nuclear Regulatory Commission must approve the transfer of the construction permits for Bellefon-te-1 and -2, a process that is likely to take months. At that time, Nuclear Development had not filed its application for the permit transfers; the application was submitted to the NRC on November 13. TVA notified Nuclear Development on November 29 that it did not intend to close the sale.
机译:TVA正因其决定停止销售其Bellefonte工厂的决定而受到NUCLEAR DEVELOPMENT LLC的起诉。田纳西河谷管理局于2016年11月同意以1.11亿美元的价格将阿拉巴马州好莱坞附近的未完成的核设施出售给核发展公司,并于2018年11月完成交易(NN,2016年12月,第21页)。根据核发展公司的投诉,在11月14日截止日期前几天,TVA提出了一个未曾预料到的问题,声称根据《原子能法》第101条,在出售完成之前,核监管委员会必须批准建造工程的转让。 Bellefon-te-1和-2的许可,这一过程可能需要几个月的时间。当时,核发展公司尚未提出转让许可证的申请;该申请已于11月13日提交给了NRC。TVA于11月29日通知核发展,它不打算结束出售。

著录项

  • 来源
    《Nuclear news》 |2019年第1期|17-1859-60|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号