...
首页> 外文期刊>The nuclear review >Climate for Nuclear Power Warms in the UK Despite Early Closures
【24h】

Climate for Nuclear Power Warms in the UK Despite Early Closures

机译:尽管早期关闭,英国的核电气候温暖

获取原文
获取原文并翻译 | 示例
           

摘要

The UK fleet of eight reactors, operated by Électricité de France (EdF), are mostly of the indigenous advanced gas-cooled reactor (AGR) design and are reaching the end of their licensed lives. Without new builds, installed nuclear power capacity is forecast to fall from 9 GW to 6 GW over the next five years and reach just 1 GW by 2031. However, the two-unit Hinkley Point C project is under construction and slated for completion in the 2025-2026 time frame and other proposed projects may advance in the coming years if ownership and financing challenges can be resolved (Figure 1). Moreover, an Energy White Paper, published by the UK Department for Business, Energy, & Industrial Strategy this week, clearly states that nuclear and advanced nuclear technologies have a key role in achieving goals to carbon neutrality and in realizing a green economic recovery.
机译:由ÉlectricédeFrance(EDF)运营的八架电炉的队列主要是土着先进的气体冷却反应堆(AGR)设计,并达到其许可的生命结束。没有新的构建,预计安装的核电能力在未来五年内从9 GW到6 GW下降,到2031年达到1 GW。但是,两组Hinkley Point C项目正在建设中,并在建设中进行建设并完成2025-2026时间框架和其他拟议项目可能会在未来几年推进,如果可以解决所有权和融资挑战(图1)。此外,本周由英国商业,能源和产业战略发布的能量白皮书,明确指出,核和先进的核技术在实现碳中立的目标和实现绿色经济复苏方面具有关键作用。

著录项

  • 来源
    《The nuclear review》 |2020年第18期|4-5|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号