En Europe, les réacteurs pour l'étude des matériaux et des combustibles sous irradiation ont été construits dans les années 1960. La plupart d'entre eux seront progressivement arrêtés à partir de la prochaine décennie, après avoir fonctionné près de 50 ans. L'objectif du réacteur Jules Horowitz (physicien et pionnier au CEA de la physique des réacteurs) est de disposer, dès 2014, d'un outil de recherche moderne permettant de maintenir en Europe un haut niveau d'expertise pour le développement d'une énergie nucléaire durable. Le projet RJH répond à cet enjeu scientifique et technologique pour : - l'amélioration de la compétitivité et de la durée de vie des centrales actuelles (Génération II), - Le développement des combustibles et matériaux qui accompagneront l'évolution des réacteurs à eau légère type EPR ou autre (génération III), - Le développement de nouveaux matériaux et combustibles pour les systèmes du futur (Génération IV), - Le test d'échantillons en situations incidentelle et accidentelle, - La production en Europe de radioéléments pour les applications médicales. Les études de définition ont été menées de 2003 à 2005 et les procédures administratives en 2005 et 2006. Un consortium international fédérant le projet (CEA, EDF, AREVA, République Tchèque, Finlande, Espagne, Belgique, Commission Européenne, Japon) a été mis en place et la construction du réacteur à été officiellement lancée le 19 mars 2007 sur le site de Cadarache. En 2008, 2 nouveaux partenaires sont venus rejoindre le consortium gérant le projet RJH : l'électricien Suédois VATTENFALL et les centres de recherches de l'Inde que sont le BARC et IGCAR. La durée de vie du réacteur RJH est de 50 ans. Il accompagnera donc les travaux scientifiques liés au développement des trois générations de réacteurs électrogènes précitées pendant la majorité de ce siècle. Son implantation sur le site de Cadarache s'inscrit dans la vocation de ce centre, plate-forme de recherche énergétique majeure en Europe (recherche sur les combustibles nucléaires avec les installations LEFCA et LECA, complémentarité avec les autres réacteurs expérimentaux notamment CABRI pour les essais de sûreté...). Cet article décrit les enjeux de ce futur réacteur de recherche Européen ainsi que les développements menés actuellement pour bâtir la première capacité expérimentale du RJH. Il décrit aussi le point de vue de l'électricien Suédois VATTENFALL vis-à-vis de cet outil de recherche.%The development of nuclear power as a sustainable and competitive energy source will continue to require R&D on fuel and material behaviour under irradiation. This necessitates a high performance Research Reactor called Material Testing Reactor (MTR) in order to meet future needs and challenges for the benefit of industry, research institutes and public bodies. As an example we can quote the fuel and material technologies in present and future nuclear power plants that are continuously upgraded to achieve better performances both for competitiveness and for lifetime extension as well as maintaining highest attainable level of safety. Facing the obsolescence of most of the existing MTR used by industry - and particularly in Europe - these challenges require secured access to a modern and up-to-date high performance MTR such as the Jules Horowitz Reactor (JHR) under construction in the CEA Cadarache Research Centre (start-up scheduled for 2014). JHR is designed, built and will be operated as an International User Facility. This MTR is funded and steered by a consortium with Members contributing to the financing of the JHR construction. At the present time, 3 industrial companies and 6 research institutes are members of the consortium. JHR is selected in the ESFRI roadmap and the European Commission is supporting this initiative. Members will have guaranteed access rights to JRH experimental capacities. In parallel and in order to gather a larger international scientist community around this User Facility, CEA, with the support of OECD/NEA, is launching an International Program as of 2012 (beginning with potential experiments in existing facilities). CEA is developing a first set of experimental hosting devices in order to make JHR experimental capacity available for the start of operation. Launching a new set of experimental devices offers the opportunity to upgrade the devices to better match present safety requirements and to implement innovative solutions. The paper will present the construction status, the developments of experimental hosting devices, the potential topics of the future International Program, and the point of view of VATTENFALL, as a major European utility member of the Consortium, for JHR perspective uses.
机译:在欧洲,用于辐射下的材料和燃料研究的反应堆建于1960年代,在运行了将近50年之后,大部分反应堆将从下一个十年开始淘汰。 Jules Horowitz反应堆(反应堆物理学家CEA的物理学家和先驱)的目标是,从2014年起拥有一种现代化的研究工具,从而有可能在欧洲保持高水平的专业知识以发展核反应堆。可持续核能。 RJH项目对以下科学和技术挑战做出了回应:-提高现有电厂的竞争力和使用寿命(第二代),-轻水反应堆的发展将伴随燃料和材料的发展EPR或其他类型(第三代),-为未来系统开发新材料和燃料(第四代),-在事故和事故情况下对样品进行测试,-在欧洲生产用于医疗用途的放射性元素。定义研究从2003年至2005年进行,行政程序于2005年和2006年进行。建立了一个国际项目联合会(CEA,EDF,AREVA,捷克共和国,芬兰,西班牙,比利时,欧盟委员会,日本)该反应堆已安装到位,并于2007年3月19日在Cadarache基地正式启动了该反应堆的建设。 2008年,有2个新的合作伙伴加入了管理RJH项目的财团:瑞典电工VATTENFALL以及印度的BARC和IGCAR研究中心。 RJH反应器的使用寿命为50年。因此,它将支持与本世纪大部分时间上述的第三代发电机的开发有关的科学工作。它在Cadarache站点上的位置符合该中心的职能,该中心是欧洲的主要能源研究平台(具有LEFCA和LECA装置的核燃料的研究,与其他实验堆的互补性,特别是CABRI的测试)安全...)。本文介绍了这个未来的欧洲研究堆所面临的挑战,以及为建立RJH的首个实验能力而正在进行的发展。它还描述了瑞典电工VATTENFALL对该研究工具的观点。%核电作为一种可持续发展的竞争性能源,其发展将继续要求在辐射下进行燃料和材料性能方面的研发。这需要一种称为材料测试反应堆(MTR)的高性能研究堆,以便满足未来的需求和挑战,从而造福于工业,研究机构和公共机构。例如,我们可以引用当前和将来的核电厂中不断升级的燃料和材料技术,以实现更好的性能,以提高竞争力和延长使用寿命,并保持最高的安全级别。面对工业(尤其是欧洲)所使用的大多数现有MTR的淘汰,这些挑战需要安全地使用现代和最新的高性能MTR,例如正在CEA Cadarache建造的Jules Horowitz反应堆(JHR)研究中心(计划于2014年启动)。 JHR的设计,建造将作为国际用户工具进行操作。该MTR由一个财团提供资金和指导,成员为JHR建设的融资做出了贡献。目前,该联盟的成员有3家工业公司和6个研究所。在ESFRI路线图中选择了JHR,欧洲委员会对此计划表示支持。成员将拥有对JRH实验能力的访问权。同时,为了在该用户设施周围聚集更大的国际科学家社区,CEA在OECD / NEA的支持下,于2012年启动了一项国际计划(从现有设施中的潜在实验开始)。 CEA正在开发第一组实验托管设备,以使JHR实验能力可用于开始运营。推出一组新的实验设备可提供升级设备的机会,以更好地满足当前的安全要求并实施创新的解决方案。本文将介绍JHR视角的建设状况,实验托管设备的发展,未来国际计划的潜在主题以及作为财团的主要欧洲公共事业成员VATTENFALL的观点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号