首页> 外文期刊>Nuclear fusion >Demonstration tokamak fusion power plant for early realization of net electric power generation
【24h】

Demonstration tokamak fusion power plant for early realization of net electric power generation

机译:托卡马克聚变电站示范,用于早期实现净发电

获取原文
获取原文并翻译 | 示例
           

摘要

A demonstration tokamak fusion power plant Demo-CREST is proposed as the device for early realization of net electric power generation by fusion energy. The plasma configuration for Demo-CREST is optimized to satisfy the electric breakeven condition (the condition for net electric power, (P{sub}e){sup}(net) = 0 MW) with the plasma performance of the ITER reference operation mode. This optimization method is considered to be suitable for the design of a demonstration power plant for early realization of net electric power generation, because the demonstration power plant has to ensure the net electric generation. Plasma performance should also be more reliably achieved than in past design studies. For the plasma performance planned in the present ITER programme, net electric power from 0 to 500 MW is possible with Demo-CREST under the following engineering conditions: maximum magnetic field 16T, thermal efficiency 30%, NBI system efficiency 50% and NBI current drive power restricted to 200 MW. By replacing the blanket system with one of higher thermal efficiency, a net electric power of about 1000MW is also possible so that the performance of the commercial plant with Demo-CREST can also be studied from the economic point of view. The development path from the experimental reactor 'ITER' to the commercial plant 'CREST' through the demonstration power plant 'Demo-CREST' is proposed as an example of the fast track concept.
机译:提出了一个示范托卡马克聚变电站Demo-CREST作为通过聚变能早期实现净发电的装置。 Demo-CREST的等离子配置经过优化,以满足ITER参考运行模式的等离子性能,满足电收支平衡条件(净功率条件(P {sub} e){sup}(net)= 0 MW) 。该优化方法被认为适合于为早日实现净发电的示范电厂的设计,因为示范电厂必须确保净发电。血浆性能也应比过去的设计研究更可靠地实现。对于当前ITER计划中计划的等离子性能,在以下工程条件下,使用Demo-CREST可实现0至500 MW的净电功率:最大磁场16T,热效率30%,NBI系统效率50%和NBI电流驱动功率限制为200 MW。通过用更高的热效率之一代替橡皮布系统,大约1000兆瓦的净电功率也是可能的,因此,从经济的角度来看,使用Demo-CREST的商业工厂的性能也可以得到研究。提出了从实验堆“ ITER”到商业工厂“ CREST”到示范电厂“ Demo-CREST”的开发路径,作为快速通道概念的一个示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号