首页> 外文期刊>Nuclear fusion >Final integration, commissioning and start of the Wendelstein 7-X stellarator operation
【24h】

Final integration, commissioning and start of the Wendelstein 7-X stellarator operation

机译:Wendelstein 7-X恒星发生器的最终集成,调试和启动

获取原文
获取原文并翻译 | 示例
           

摘要

The main objective of the Wendelstein 7-X (W7-X) stellarator is to demonstrate the integrated reactor potential of the optimized stellarator line. An important element of this mission is the achievement of high heating-power and high confinement in steady-state operation. Such an integrated plasma operation has not yet been demonstrated and represents the major scientific goal of W7-X. The way towards this goal is staged. In the first phase, called OP 1.1, December 2015-March 2016, a limiter configuration was used. In this paper, the preparation of the first operation phase as well as lessons learned during the first commissioning and the operation phase are discussed, while the physics results from OP 1.1 are reported elsewhere (Wolf et al 2017 Nucl. Fusion 57 102020).
机译:Wendelstein 7-X(W7-X)恒星发生器的主要目的是证明优化的恒星发生器系列的综合反应堆潜力。该任务的重要组成部分是在稳态操作中实现高热功率和高限制。这种集成的等离子操作尚未得到证实,代表了W7-X的主要科学目标。朝着这个目标迈进的路已经上演了。在2015年12月至2016年3月的第一阶段,称为OP 1.1,使用了限制器配置。本文讨论了第一个操作阶段的准备以及在首次调试和操作阶段的经验教训,而OP 1.1的物理结果已在其他地方进行了报道(Wolf等,2017,Nucl.Fusion 57 102020)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号