...
首页> 外文期刊>Nuclear fuel cycle monitor >NRC RELEASES YUCCA MOUNTAIN TECHNICAL EVALUATION REPORT
【24h】

NRC RELEASES YUCCA MOUNTAIN TECHNICAL EVALUATION REPORT

机译:NRC发布了尤卡山技术评估报告

获取原文
获取原文并翻译 | 示例

摘要

The Nuclear Regulatory Commission has released a Technical Evaluation Report on the long term safety of Yucca Mountain, which NRC staff prepared to replace an unreleased Safety Evaluation Report as the agency closes out its review of the repository. The TER "is intended as a public record of the staff's scientific and technical work in preparing for and reviewing the application. It was developed using the draft Volume Ⅲ of the staffs Safety Evaluation Report on the application," according to an NRC release. "The TER was prepared as part of the agency's knowledge management activities during the closeout of the Yucca Mountain licensing review. The closeout, including publication of two additional TERs, is expected to be complete by Sept. 30."
机译:核监管委员会发布了关于丝兰山的长期安全性的技术评估报告,随着该机构关闭对储存库的审查,NRC工作人员准备替换未发布的安全性评估报告。根据美国国家研究委员会(NRC)的发布,TER“旨在作为工作人员在准备和审查申请过程中的科学和技术工作的公开记录。它是根据工作人员安全性评估报告中的第三卷草案而制定的。” “ TER是在结束丝兰山许可审查期间,作为该机构知识管理活动的一部分而准备的。此次关闭,包括另外两个TER的发布,预计将在9月30日完成。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号