首页> 外文期刊>Nuclear Engineering International >The Yucca Mountain review plan
【24h】

The Yucca Mountain review plan

机译:丝兰山审查计划

获取原文
获取原文并翻译 | 示例
       

摘要

The Yucca Mountain Review Plan embodies guidance for the review of any licence application from the US Department of Energy (DoE) for a geologic repository for disposal of high-level radioactive waste. The US Nuclear Regulatory Commission (NRC) has directed its staff to carry out risk-informed and performance-based regulatory programmes, based on the risk of health effects to the reasonably maximally exposed individual. It also sets out to ensure the protection of ground water and assess repository performance under conditions of human intrusion. The principal purpose of the Yucca Mountain Review Plan is to ensure the quality and uniformity of licensing reviews. An acceptance review is the first screening of the DoE licence application. The application must provide enough information to demonstrate compliance with the regulations. The acceptance review does not determine the technical adequacy of the submitted information.
机译:丝兰山区审查计划体现了审查美国能源部(DoE)处置高放射性废物地质库的任何许可申请的指南。美国核监管委员会(NRC)指示其员工根据对合理暴露量最大的个体造成健康影响的风险,执行以风险为依据且基于绩效的监管计划。它还着手确保对地下水的保护,并在人为入侵的条件下评估储存库的性能。丝兰山区审查计划的主要目的是确保许可审查的质量和统一性。接受审查是对DoE许可证申请的首次筛选。该应用程序必须提供足够的信息以证明符合法规。验收审查不能确定所提交信息的技术充分性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号