首页> 外文期刊>Nuclear Engineering International >Taking up arms for decommissioning
【24h】

Taking up arms for decommissioning

机译:拿起武器退役

获取原文
获取原文并翻译 | 示例
           

摘要

The United Kingdom Atomic Energy Authority (UKAEA) has built and operated a wide range of nuclear facilities since the late 1940s. The UKAEA's mission is to restore the environment of its sites in a safe and secure manner, using currently available technology. This restoration includes the decommissioning of a number of redundant research and power reactors at five UK sites. At the Windscale site in Cumbria, the UKAEA and its contractors started ed a project in 1998 to remove the core and pressure vessel of the Wind-scale Advanced Gas-cooled Reactor (WAGR). The project is currently in the eighth of ten 'campaigns' -the last of which is due to finish, within budget, in summer 2005 (see Table, p15). The principal technical difficulty associated with the removal of the activated components of the core and pressure vessel was that radiation dose rates of approximately 1Sv/h were anticipated in much of the reactor. In some cases this precluded manual dismantling operations and demanded the use of remotely operated equipment. In other areas, dismantling could be achieved by a combination of remote, semi-remote and manual operations.
机译:自1940年代后期以来,英国原子能管理局(UKAEA)已建造并运营了广泛的核设施。 UKAEA的使命是使用当前可用的技术以安全可靠的方式恢复其场地的环境。修复工作包括在英国的五个站点退役大量冗余研究和动力堆。 UKAEA及其承包商在坎布里亚郡的Windscale站点于1998年启动了一个项目,以拆除Wind-scale先进气冷堆(WAGR)的堆芯和压力容器。该项目目前在十个“活动”中排名第八-计划在2005年夏季完成最后一个活动(见表,第15页)。与除去堆芯和压力容器的活化组分有关的主要技术困难是,在许多反应堆中预期辐射剂量率约为1Sv / h。在某些情况下,这排除了手动拆卸操作的必要,因此要求使用远程操作的设备。在其他地区,可以通过结合远程,半远程和手动操作来实现拆卸。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号