【24h】

Resende developments

机译:反映发展

获取原文
获取原文并翻译 | 示例
       

摘要

Brazil has always strived for self-sufficiency in nuclear power generation but the ambitious plans of the 1970s were never realised, leaving Brazil with just Angra 1&2 and the equipment for a third, all sited at Angra Dos Reis in Rio de Janeiro state. Angra 3 was originally contracted with German firm KraftwerkUnion (KWU), part of Siemens, which was taken over by Framatome ANP (now Areva).
机译:巴西一直在努力实现核发电的自给自足,但从未实现1970年代的雄心勃勃的计划,巴西只剩下安格拉1&2和三分之一的设备,都位于里约热内卢州的安格拉杜斯雷斯。 Angra 3最初与德国公司KraftwerkUnion(KWU)签订了合同,后者是西门子的一部分,由Framatome ANP(现为Areva)接管。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号