There were a total of 387 nuclear units for which data was available and which had completed 12 months operation to the end of June 2008. Cernavoda 2 does not join the main table until the end of September quarter. These generated 2451.6TWh during the previous 12 months, making their lifetime total 54056.3TWh. This was achieved with an overall average annual load factor of 76.0%, and an average lifetime load factor of 71.9%, an increase over the last quarter of both load factors. The 425 units which are included in Tables 1 and 2 (including the "not availables") represented a total of 387,914MWe installed capacity and 10,511.8 reactor years of nuclear power production. The quarter was a landmark for lifetime performance figures.
机译:截止到2008年6月,总共有387个核单元获得了数据,并且已经完成了12个月的运行。Cernavoda2直到9月季度末才加入主表。在过去的12个月中,它们的发电量为2451.6TWh,使用寿命为54056.3TWh。总的年度平均负载率为76.0%,平均寿命负载率为71.9%,这比两个负载因子的最后一个季度都增加了。表1和表2中包括的425台机组(包括“不可用的机组”)代表了总计387,914MWe的装机容量和10,511.8个反应堆年的核电生产。该季度是终身绩效数据的里程碑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号