【24h】

PBR safety revisited

机译:重新审阅PBR安全

获取原文
获取原文并翻译 | 示例
           

摘要

Pebble bed reactors are attracting worldwide interest because of their high gas outlet temperatures, allowing applications beyond electricity generation. Germany has the most experience with the technology, and a detailed examination of that country's PBR experience is therefore appropriate, especially because of a lack of other long-term experience. Germany has constructed and operated two PBRs. The Arbeitsgemeinschaft Versuchsreaktor (AVR), or Working Group Test Reactor (46MWt, 15MWe), was operated over the period 1967-1988 at coolant (He) outlet temperatures up to 990℃, which are in principle suitable for process heat applications such as hydrogen generation by splitting water. Its availability (time basis) was 66%. After a construction time of 14 years, the Thorium-HTR THTR300 (750MWt, 300 MWe), was operated from 1985 to 1989 at coolant exit temperatures of 750℃, but for a total of only 1.2 fall power years (fpy).
机译:卵石床反应器因其出气口温度高而吸引了全世界的关注,其应用范围超出了发电。德国拥有最丰富的技术经验,因此,对该国的PBR经验进行详细检查是适当的,尤其是因为缺乏其他长期经验。德国已经建造并运营了两个PBR。 Arbeitsgemeinschaft Versuchsreaktor(AVR)或工作组测试反应堆(46MWt,15MWe)在1967-1988年期间在冷却剂(He)出口温度高达990℃的条件下运行,原则上适用于过程热应用,例如氢气分解水来发电。其可用性(基于时间)为66%。经过14年的建造时间,Thorium-HTR THTR300(750MWt,300 MWe)于1985年至1989年在冷却液出口温度为750℃的条件下运行,但总共只有1.2个下降功率年(fpy)。

著录项

  • 来源
    《Nuclear Engineering International》 |2009年第656期|16-1719-20|共4页
  • 作者

    Rainer Moormann;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号