首页> 外文期刊>Nuclear Engineering International >Heat exchanger cleaning at French nuclear plants
【24h】

Heat exchanger cleaning at French nuclear plants

机译:法国核电站的热交换器清洁

获取原文
获取原文并翻译 | 示例
       

摘要

French nuclear power plant MSRs, particularly the oldest ones (Fessenheim and Bugey), are subject to the build-up of magnetite deposits, resulting from steam eroding the tube system. As deposits build up on the inner surfaces of the tubes, they impede flow, and increase the pressure drop between inlet and outlet of the MSR. In some cases, the pressure drop amount has been found to be near the maximum design criterion. This effect could result in equipment damage and loss of plant productivity. Consequently, the MSR must be cleaned periodically.
机译:法国核电站的MSR,特别是最古老的核电站(Fessenheim和Bugey),由于蒸汽腐蚀管道系统而导致磁铁矿堆积。当沉积物堆积在管子的内表面上时,它们会阻碍流动,并增加MSR入口和出口之间的压降。在某些情况下,已经发现压降量接近最大设计标准。这种影响可能会导致设备损坏并降低工厂生产率。因此,必须定期清洁MSR。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号