Station blackout (SBO) is a typical beyond design basis accident (BDBA) and significant contributor to overall plant risk. The risk analysis of SBO could be important basis of rulemaking, accident mitigation strategy, etc. Recently, studies on the integrated approach of deterministic and probabilistic method for nuclear safety in nuclear power plants have been done, and among them, the combined deterministic and probabilistic procedure (CDPP) was proposed for safety assessment of the BDBAs. In the CDPP, the conditional exceedance probability obtained by the best estimate plus uncertainty method acts as go-between deterministic and probabilistic safety assessments, resulting in more reliable values of core damage frequency and conditional core damage probability. In this study, the safety assessment of OPR-1000 nuclear power plant for SBO accident was performed by applying the CDPP. It was confirmed that the SBO risk should be reevaluated by eliminating excessive conservatism in existing probabilistic safety assessment to meet the targeted core damage frequency and conditional core damage probability. By estimating the offsite power restoration time appropriately, the SBO risk was reevaluated, and it was finally confirmed that current OPR-1000 system lies in the acceptable risk against the SBO. In addition, it is concluded that the CDPP is applicable to safety assessment of BDBAs in nuclear power plants without significant erosion of the safety margin. (C) 2014 Elsevier B.V. All rights reserved.
机译:车站停电(SBO)是典型的超出设计基准事故(BDBA),并且是整个工厂风险的重要因素。 SBO的风险分析可能是制定规则,减轻事故策略等的重要基础。最近,已经对确定性和概率性方法用于核电厂的集成方法进行了研究,其中包括确定性和概率性方法的组合。提出了程序(CDPP)用于BDBA的安全性评估。在CDPP中,通过最佳估计加不确定性方法获得的条件超出概率充当确定性和概率性安全评估之间的中间点,从而导致更可靠的堆芯损坏频率和条件堆芯损坏概率值。在这项研究中,通过应用CDPP对OPR-1000核电站进行SBO事故的安全性评估。已确认,应通过消除现有概率安全性评估中的过度保守性来重新评估SBO风险,以达到目标核心损坏频率和有条件的核心损坏概率。通过适当估计异地电源恢复时间,重新评估了SBO风险,并最终确定当前OPR-1000系统处于针对SBO的可接受风险内。此外,得出的结论是,CDPP适用于核电厂BDBA的安全性评估,而不会严重削弱安全系数。 (C)2014 Elsevier B.V.保留所有权利。

著录项

  • 来源
    《Nuclear Engineering and Design》 |2014年第8期|142-153|共12页
  • 作者

    Kang Dong Gu; Chang Soon Heung;

  • 作者单位

    Korea Inst Nucl Safety, Taejon 305338, South Korea|Korea Adv Inst Sci & Technol, Taejon 305701, South Korea;

    Korea Adv Inst Sci & Technol, Taejon 305701, South Korea;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号