首页> 外文期刊>Nuclear future >Awaiting the GDF - best practice for the storage of packaged wastes
【24h】

Awaiting the GDF - best practice for the storage of packaged wastes

机译:等待GDF-打包废物存储的最佳实践

获取原文
获取原文并翻译 | 示例
       

摘要

1. As the planned opening of the UK Geological Disposal Facility (GDF) is still decades away, waste packages, and the stores that protect them, are therefore key assets that require active management. 2. Guidance on an integrated approach to the interim storage of waste packages was first published in 2012, and is maintained through the pan-industry Store Operations Forum (SOF), led by Radioactive Waste Management Limited (RWM). 3. The guidance comprises several elements designed to encourage good practice on waste package performance and to implement a well-underpinned monitoring and inspection regime.
机译:1.由于英国地质处置设施(GDF)计划开放的时间仍在数十年之内,因此废物包装以及对其进行保护的商店是需要积极管理的关键资产。 2.关于废物包装临时存储的综合方法的指南于2012年首次发布,并由放射性废物管理有限公司(RWM)领导的全行业商店运营论坛(SOF)予以维护。 3.该指南包括若干要素,旨在鼓励人们对废物包的性能采取良好做法,并实施有力的监测和检查制度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号