首页> 外文期刊>The New Zealand Railway Observer >Form the Top of the Raurimu Spiral
【24h】

Form the Top of the Raurimu Spiral

机译:形成Raurimu螺旋的顶部

获取原文
获取原文并翻译 | 示例
           

摘要

The last two months have seen major developments for KiwiRail, with commitments from Government to build a line to Marsden Point and the re-build of Hillside Workshops. However, one major announcement was not made - the purchase of new mainline locomotives for the South Island. The line from Oakleigh to Marsden Point has been a long time coming. The 19km line was first proposed in February 1969 when the then Northland Harbour Board planned to develop a national container port servicing all New Zealand at Marsden Point. A rail connection to the port's development was an integral part of the proposal. The plan did not have the support of the New Zealand Ports Authority, because of pressure from other harbour boards, and so did not eventuate. The concept of a deep water port at Marsden Point has been discussed ever since, but local body politics still feature strongly.
机译:过去两个月已经看到了Kiwirail的重大发展,政府承诺建立一条线,向马斯登点和山坡研讨会的重新建立。 但是,没有提出一项重大公告 - 购买南岛的新主线机车。 从奥克莱到马斯顿点的线条即将到来。 19公里线首次提出1969年2月,当时北国港口委员会计划开发一个在马斯顿点提供全国新西兰的国家集装箱港口。 与港口开发的铁路连接是该提案的一个组成部分。 该计划没有得到新西兰港口权力的支持,因为其他港口委员会的压力,因此并未达到。 自从Marsden Point的深水港口的概念已经讨论过,但当地的身体政治仍然强烈阐述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号