【24h】

Down at the Station

机译:在车站下来

获取原文
获取原文并翻译 | 示例
           

摘要

As from Monday 20 July the Auckland commuter network became fully serviced by electric multiple units. Electric trains will now operate as far as Swanson on the Western Line and as far as Papakura on the Southern Line. This is the final stage of the electric train roll-out which started operating on the Onehunga Line in 2014. Buses will transport passengers between Swanson and Waitakere, and diesel hauled trains will operate between Papakura and Pukekohe. In the last year 13 million passenger trips were made on the commuter trains compared with 1.1 million in 1983. The redundant diesel multiple units and coaches have been parked on unused sidings at Helensville and Taumarunui while their disposal is arranged. While in storage the rolling stock has been plastic wrapped, with security guards employed to prevent vandalism.
机译:从7月20日星期一开始,奥克兰通勤网络已完全由多个电力单元提供服务。现在,电动火车将一直运行到西线的Swanson和南线的Papakura。这是2014年开始在Onehunga线上运行的电动火车推出的最后阶段。公共汽车将在Swanson和Waitakere之间运送乘客,而柴油牵引火车将在Papakura和Pukekohe之间运行。去年,通勤火车上有1300万人次乘车,而1983年为110万人次。多余的柴油多单元和大客车停放在Helensville和Taumarunui的未使用的壁板上,并进行了安排。在存储过程中,机车车辆被塑料包裹,并采用了安全防护装置来防止故意破坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号