首页> 外文期刊>The New Zealand Railway Observer >From the top of the Raurimu Spiral
【24h】

From the top of the Raurimu Spiral

机译:从Raurimu螺旋的顶部

获取原文
获取原文并翻译 | 示例
           

摘要

The New Zealand Herald of Monday 1 June contained a Letter to the Editor from Derek Mills of Waihi. It started with, In the latest N Z Railway Observer magazine, it is reported that KiwiRail is considering scrapping electrification of the main trunk railway between Palmerston North and Hamilton and using diesellocomotives. The letter then discusses the writer's opinions on the merits of electric traction and concludes with - If this decision goes ahead, it would be a very large backward step for KiwiRail. It is very humbling to note that items featured in this magazine make it into the pages of New Zealand's major newspaper.
机译:6月1日星期一的《新西兰先驱报》载有Waihi的Derek Mills给编辑的信。首先,在最新的《新泽西铁路观察家》杂志中,有报道称KiwiRail正在考虑废弃北帕默斯顿和汉密尔顿之间的主要干线铁路的电气化,并使用柴油机车。随后,这封信讨论了作者对电牵引性能的看法,并得出以下结论:-如果这一决定继续进行,对于KiwiRail而言将是非常大的后退。非常荣幸地注意到,该杂志的特色文章进入了新西兰主要报纸的页面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号