...
首页> 外文期刊>New civil engineer >Mott's Wembley stadium defence goes into extra time
【24h】

Mott's Wembley stadium defence goes into extra time

机译:莫特的温布利球场防守时间增加

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Wembley stadium designer Mott MacDonald was this week given extra time to prepare its defence case for the £253M claim lodged against it by the stadium's contractor Multiplex.rnThe claim relates to a dispute over delays and cost overruns affecting the design and fabrication of steelwork for the Wembley stadium project.rnMultiplex, now trading as Brookfield, slapped what is thought to be the biggest construction claim in history on the consultant last December.
机译:温布利球场设计师莫特·麦克唐纳(Mott MacDonald)本周获得了更多的时间来准备其辩护案,以应对球场承包商承包商Multiplex提出的2.53亿英镑的索赔要求。该索赔涉及延误和成本超支的争议,影响了钢结构的设计和制造。温布利体育馆项目.rnMultiplex(现在以布鲁克菲尔德的名称进行交易)去年12月对该顾问​​拍出了有史以来最大的建筑索赔案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号