Wembley stadium designer Mott MacDonald was this week given extra time to prepare its defence case for the £253M claim lodged against it by the stadium's contractor Multiplex.rnThe claim relates to a dispute over delays and cost overruns affecting the design and fabrication of steelwork for the Wembley stadium project.rnMultiplex, now trading as Brookfield, slapped what is thought to be the biggest construction claim in history on the consultant last December.
展开▼