...
首页> 外文期刊>New civil engineer >Mine Stabilisation a key part of Stoke-on-Trent Regeneration
【24h】

Mine Stabilisation a key part of Stoke-on-Trent Regeneration

机译:稳定矿井是特伦特河畔斯托克再生的关键部分

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

M & J Drilling completed 3 months of mine stabilisation works last week as part of the initial phase of the City of Stoke-on-Trent's Central Business District (CBD) delivered through "Mandate for Change" aimed at supporting local businesses and regenerating the local economy. The scheme is being delivered by Genr8 Developments, who focus on large scale mixed use regeneration schemes. Cenr8 is supported by Christal Construction Management and Arup who are providing various Project, Cost and Engineering Consultancy services. The redevelopment of the site involves an initial enabling works package that is being undertaken in the historical heart of the Potteries.
机译:M&J Drilling上周完成了为期3个月的矿山稳定工作,这是特伦特河畔斯托克市中央商务区(CBD)初期阶段的一部分,该中心通过“变革授权”交付,旨在支持当地企业并复兴当地经济。该计划由Genr8 Developments提供,该公司专注于大型混合用途再生计划。 Cenr8得到Christal Construction Management和Arup的支持,后者提供各种项目,成本和工程咨询服务。该场地的重建涉及在陶器历史中心进行的初期赋能工作包。

著录项

  • 来源
    《New civil engineer》 |2013年第11期|34-34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号