...
首页> 外文期刊>New civil engineer >Industry backs calls to bring forward HS2 second phase
【24h】

Industry backs calls to bring forward HS2 second phase

机译:业界支持将HS2第二阶段推进的呼吁

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Engineers have backed calls by new High Speed 2 boss David Higgins to bring forward work on the northern section of the railway. Chairman David Higgins said on Monday a section north of the London-to-Birmingham first phase could be built earlier to serve a newly introduced interchange station at Crewe. ICE director general Nick Baveystock said there was no engineering reason not to ensure the entire scheme to Leeds and Manchester was operational before the original 2033 opening date. Higgins has also proposed to bring this date forward by three years.
机译:工程师支持了新的“高速2”老板大卫·希金斯的电话,要求推进铁路北部的工作。主席戴维·希金斯(David Higgins)周一表示,伦敦至伯明翰第一阶段以北的部分路段可能会较早建造,以服务克鲁最近新建的换乘站。 ICE局长尼克·巴维斯托克(Nick Baveystock)表示,没有工程上的理由不确保针对利兹和曼彻斯特的整个计划在原定的2033年开放日期之前投入运营。希金斯还提议将这一日期提前三年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号