Network Rail has released timelapse footage showing the 24-hour-a-day operation to clear the massive landslip that closed a section of the railway for almost six weeks. Three hundred and fifty thousand tonnes of cutting collapsed near Harbury Tunnel in Warwickshire on 31 January this year. This meant the railway had to be shut between Banbury and Leamington Spa, affecting a number of long-distance services.
展开▼