首页> 外文期刊>New civil engineer >Engineering behind double deck solution to Hammersmith Bridge repair work revealed
【24h】

Engineering behind double deck solution to Hammersmith Bridge repair work revealed

机译:双层甲板桥修理工作后甲板解决方案后面的工程揭晓

获取原文
获取原文并翻译 | 示例
           

摘要

Atemporary double deck structure running above the Hammersmith Bridge roadway in west London could allow pedestrians and motorists to cross the River Thames while vital repairs to the bridge are carried out. According to engineers backing the concept, the solution would also aid the permanent repair programme, shaving time and around ζ40M from the cost of the S141M project. It will also create a safer environment for contractors working on the repairs and be more environmentally friendly than current proposals.
机译:伦敦西部锤桥巷道上方的现代双层结构可以允许行人和驾驶者穿过泰晤士河,同时进行了对桥的重要修理。根据工程师备份概念,解决方案还可以帮助剃须时间,剃须时间和大约№40M从S141M项目的成本。它还将为维修工作的承包商创建更安全的环境,而不是当前提案更环保。

著录项

  • 来源
    《New civil engineer》 |2021年第5期|11-12|共2页
  • 作者

    ROB HORGAN;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号