...
首页> 外文期刊>New civil engineer >Contractors strive to shut sites quickly and safely
【24h】

Contractors strive to shut sites quickly and safely

机译:承包商努力快速安全地关闭现场

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Closing sites that cannot be operated safely during the coronavirus crisis is stretching the ingenuity of Britain's construction industry, forced to confront unique circumstances at speed. Lack of certainty about when the crisis will end makes planning and implementing shutdowns more complex. Achieving safe closure with minimal notice is adding to the challenges contractors face. Temporary shutdown of sites is occurring because many construction companies consider they cannot operate within government rules and the bounds of social responsibility. Social distancing and operative welfare are particular factors. The potential longevity of the effects of Covid-19 is the root cause of difficulties being encountered by those shutting up sites. The fact that contractors do not know how long the measures they must take will have to last is complicating decision making.
机译:在冠状病毒危机期间无法安全操作的关闭站点正在扩展英国的建筑业的才智,他们不得不迅速面对独特的情况。对于危机何时结束的不确定性使计划和实施停工变得更加复杂。在最少的时间内实现安全的关闭将增加承包商面临的挑战。正在发生站点的临时关闭,因为许多建筑公司认为它们无法在政府法规和社会责任的范围内运行。社会距离和手术福利是特殊因素。 Covid-19效应的潜在寿命是那些关闭站点遇到困难的根本原因。承包商不知道必须采取多长时间的措施这一事实使决策复杂化。

著录项

  • 来源
    《New civil engineer》 |2020年第5期|11-11|共1页
  • 作者

    TY BYRD;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号