首页> 外文期刊>New Civil Engineer International >Site constraints led to mobile hopper choice
【24h】

Site constraints led to mobile hopper choice

机译:场地限制导致移动料斗的选择

获取原文
获取原文并翻译 | 示例
           

摘要

The decision to use a moving hopper at Westbourne Park stems from a need to rapidly move spoil away from site, a source close to the project said this week. The source said direct loading from a tunnel boring machine (TBM) onto a freight wagon was unusual. However, the decision to use this system by contractor BFK - a joint venture consisting of Bam Nuttal, Ferrovial and Kier - was driven by the fact that the Westbourne Park site is so constrained and that there was a need to remove spoil by rail.
机译:一位接近该项目的消息人士本周表示,在韦斯特本公园(Westbourne Park)使用移动料斗的决定是由于需要迅速将泥土移离现场。消息人士说,从隧道掘进机(TBM)直接装载到货车上是不寻常的。但是,承包商BFK(由Bam Nuttal,Ferrovial和Kier组成的合资企业)决定使用此系统,是因为Westbourne公园的场地非常狭窄,需要通过铁路清除弃渣。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号