首页> 外文期刊>Nature >Two plants to put 'clean coal' to test
【24h】

Two plants to put 'clean coal' to test

机译:两家工厂将对“清洁煤”进行测试

获取原文
获取原文并翻译 | 示例
       

摘要

When Unit 3 at the Boundary Dam Power Station in Saskatchewan, Canada, switches on later this year after a lengthy refit, it will mark a historic moment for dirty coal power. It will be the first time that a commercial-scale plant supplying electricity to the grid captures and stores a large fraction of its carbon dioxide emissions. "We're getting interest from all around the world," says Robert Watson, chief executive of provincial-government-owned plant operator SaskPower Corporation in Regina. The firm plans to sell about 1 million tonnes of CO_2 a year - up to 90% of Unit 3's emissions - to oil company Cenovus Energy of Calgary, Canada, which will pipe the compressed gas deep underground to flush out stubborn oil reserves.
机译:在加拿大萨斯喀彻温省边界大坝电站的3号机组在经过长时间的改装后于今年晚些时候启动时,这将标志着肮脏的燃煤发电的历史性时刻。这将是首次向电网供电的商业规模工厂捕获并存储其很大一部分二氧化碳排放量。 “我们正在引起世界各地的关注,”位于里贾纳的省政府拥有的电厂运营商SaskPower Corporation的首席执行官罗伯特·沃森说。该公司计划每年向加拿大卡尔加里的石油公司Cenovus Energy出售约100万吨的CO_2(占3号机组排放量的90%),该公司将把压缩气体输送到地下深处,以冲洗顽固的石油储量。

著录项

  • 来源
    《Nature》 |2014年第7498期|20-20|共1页
  • 作者

    RICHARD VAN NOORDEN;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 02:52:59

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号