首页> 外文期刊>Natural Hazards Review >Preparedness is a Marathon, Not a Sprint: A Tiered Maturity Model for Assessing Preparedness in Homeless Residential Organizations in Los Angeles
【24h】

Preparedness is a Marathon, Not a Sprint: A Tiered Maturity Model for Assessing Preparedness in Homeless Residential Organizations in Los Angeles

机译:准备是一场马拉松,而不是短跑:评估洛杉矶无家可归者住宅组织的准备状况的分层成熟度模型

获取原文
获取原文并翻译 | 示例
           

摘要

Community-based organizations (CBOs) are critical to supporting homeless individuals during disasters. However, CBOs often have difficulty engaging in preparedness planning, and are often unable to prioritize business continuity planning. This qualitative study evaluated disaster preparedness at six Los Angeles nonprofit homeless residential service providers using a tiered maturity model that organized preparedness into three progressively advanced steps: (1)life safety, (2)continuity of operations planning (COOP), and (3)collaborative relationships. Twelve semistructured interviews were conducted with executive staff and emergency planners from the six organizations. Respondents reported being very prepared in implementing life safety measures, such as having evacuation plans and vital life safety supplies. However, plans for continuity of operations tended to be limited. These organizations lacked written protocols for prioritizing among services or triaging limited staff and resources. Collaborative partnerships with peer organizations in disaster planning were extremely rare. These concerns underscore the importance of external support and guidance for CBO preparedness to enable them to plan for service continuity and connect with partners to build a more resilient safety net. (C) 2017 American Society of Civil Engineers.
机译:基于社区的组织(CBO)对于灾难期间支持无家可归者至关重要。但是,CBO通常很难进行备灾计划,并且常常无法确定业务连续性计划的优先级。这项定性研究使用分层成熟度模型评估了六家洛杉矶非营利性无家可归住宅服务提供商的灾难准备情况,该模型将准备工作分为三个逐步推进的步骤:(1)人身安全,(2)运营计划连续性(COOP)和(3)合作关系。与来自六个组织的执行人员和应急计划人员进行了十二次半结构化访谈。受访者报告说,他们在实施生命安全措施方面已经做好了充分准备,例如制定了疏散计划和重要的生命安全用品。但是,操作连续性的计划往往受到限制。这些组织缺乏书面协议来区分服务之间的优先级或对有限的人员和资源进行分类。在灾难规划中与同行组织的合作伙伴关系极为罕见。这些担忧强调了外部支持和CBO准备指南的重要性,以使他们能够计划服务连续性并与合作伙伴建立更灵活的安全网。 (C)2017年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号