When the City of Atlanta finalized plans for the capital-im-provement project at Hartsfield-Jackson Atlanta International Airport, an integral part of the 10-year, $5.4 billion project included upgrading the ventilation system of the underground Automated People Mover (APM). The APM's previous ventilation system was adequate when the APM served the A, B, C, and D Concourses. When Concourse E was added and the APM extended - now 3.5 miles long, handling 128,000 passengers an hour - the fans required upgrading to handle additional flow and pressure to meet National Fire Protection Association standards for emergency smoke evacuation. The $3.4-million set up and installation contract for mechanical and electrical equipment was awarded to W.B. Wallis & Co. (Atlanta, GA).
机译:当亚特兰大市敲定哈茨菲尔德-杰克逊亚特兰大国际机场的资本改善项目的计划时,这个为期10年,耗资54亿美元的项目的一个组成部分包括升级地下自动人行道(APM)的通风系统。当APM服务于A,B,C和D大厅时,APM以前的通风系统就足够了。添加了Concourse E后,APM扩展了-现在长3.5英里,每小时可处理128,000名乘客-风扇需要升级以处理更多的流量和压力,以满足美国国家消防协会紧急疏散烟雾的标准。 W.B.获得了价值340万美元的机电设备安装和安装合同。 Wallis&Co.(乔治亚州亚特兰大)。

著录项

  • 来源
    《NASA Tech Briefs》 |2006年第6期|p.7476|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 航空;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号