首页> 外文期刊>(mt) Marine technology >On a Firm Foundation
【24h】

On a Firm Foundation

机译:在坚实的基础上

获取原文
获取原文并翻译 | 示例
           

摘要

Awind farm 30 miles offshore can have as many as 100 individual turbines spaced neatly across the horizon. Operations seemingly go on without intervention, but looks are deceiving. In truth, these turbines require a fleet of support vessels, including jack-up rigs, to install and maintain them. The safety and efficiency of the people, processes, and hardware are all paramount for the multiple stakeholders involved. Site assessment of the jack-ups and their operations are required to keep things running on a firm foundation.
机译:离岸30英里处的Awind农场可以在地平线上整齐地排列多达100个单独的涡轮机。貌似在没有干预的情况下进行了操作,但看上去却在欺骗。实际上,这些涡轮机需要包括自升式钻机的支持船队来安装和维护它们。人员,流程和硬件的安全性和效率对于所涉及的多个利益相关者都是至关重要的。需要对自升式起重器及其操作进行现场评估,以使事情在牢固的基础上运行。

著录项

  • 来源
    《(mt) Marine technology》 |2020年第4期|26-31|共6页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号