首页> 外文期刊>MSW Management >Avoiding Disputes Down the Road: The Top 10 Problems With Landfill Gas Contracts
【24h】

Avoiding Disputes Down the Road: The Top 10 Problems With Landfill Gas Contracts

机译:避免纷争:填埋气合同的十大问题

获取原文
获取原文并翻译 | 示例
           

摘要

Everyone in the landfill gas (LFG) industry knows that contracts are a necessary evil. The parties understandably focus on the engineering aspects of the design, how many wells and engines to install, how to increase or extend gas production, how the gas production translates into revenue, the status of carbon credits or RECs, or any number of benefits that will result from a successful project. Contracts, however, serve not only to define the rights and obligations of the parties in performing the project, but they also serve to clarify the responsibilities of the parties if something goes wrong. This paper highlights 10 of the key problems that arise in performing under an LFG contract and offers some sample contract provisions to help avoid them.
机译:垃圾填埋气(LFG)行业的每个人都知道合同是必不可少的。各方可以理解地集中在设计的工程方面,要安装多少井和发动机,如何增加或扩展天然气产量,天然气产量如何转化为收入,碳信用额或REC的状态或任何可带来的好处一个成功的项目将产生的结果。但是,合同不仅可以用来定义当事方在执行项目中的权利和义务,而且还可以用来澄清当发生问题时当事方的责任。本文重点介绍了根据LFG合同履行合同时出现的10个关键问题,并提供了一些示例合同条款以帮助避免这些问题。

著录项

  • 来源
    《MSW Management》 |2015年第6期|4850-5254-5658-59|共9页
  • 作者

    PHILIP L. COMELLA;

  • 作者单位

    Environmental, Safety, and Toxic Torts Group at Seyfarth Shaw LLP, in Chicago, IL;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号