...
首页> 外文期刊>MSW Management >Leachate Collection Pipe Construction
【24h】

Leachate Collection Pipe Construction

机译:渗滤液收集管构造

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Permitting lateral and/or vertical expansions is the way for the landfill operators to remain in business, and that has resulted in permitted landfills becoming larger and taller. There are currently permitted landfills in the state of Florida or in other states with a maximum waste thickness exceeding 300 feet. Landfills with over 300-foot thicknesses may be rare, but there are many landfills with waste thicknesses over 200 feet in Florida. These landfills can apply significant compres-sive stresses on the leachate collection pipes placed below waste at the bottom of the landfill. Leachate collection pipes are considered the backbone for proper management of leachate in landfills. Without leachate collection pipes, leachate heads can quickly exceed the allowable maximum leachate head of 1.0 feet above the liner, and the agency would have to take action at that stage, possibly shutting down the landfill if leachate collection pipes are compromised to the point of not allowing flow through them.
机译:允许横向和/或垂直扩展是垃圾填埋场经营者继续经营的方式,这导致允许的垃圾填埋场变得越来越大。目前在佛罗里达州或其他州有允许的垃圾填埋场,其最大废物厚度超过300英尺。厚度超过300英尺的垃圾填埋场可能很少见,但佛罗里达州有许多垃圾厚度超过200英尺的垃圾填埋场。这些垃圾填埋场会对位于垃圾填埋场底部废物下方的渗滤液收集管施加巨大的压应力。渗滤液收集管被认为是正确处理垃圾填埋场渗滤液的基础。如果没有渗滤液收集管,渗滤液头可能会迅速超过衬里上方1.0英尺的最大允许渗滤液头,并且该机构将不得不在该阶段采取行动,如果渗滤液收集管受到损害,可能会关闭垃圾填埋场。允许流过它们。

著录项

  • 来源
    《MSW Management》 |2016年第5期|70-72|共3页
  • 作者

    AI KHATAMI;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号