首页> 外文期刊>Modern Railways >GATWICK REDEVELOPMENT PRESSES ON
【24h】

GATWICK REDEVELOPMENT PRESSES ON

机译:GATWICK重新开发势在必行

获取原文
获取原文并翻译 | 示例
           

摘要

Redevelopment of the rail station at Gatwick Airport is to go ahead, even if the government does not give the go-ahead for a new runway. The £120.5 million scheme for the station will provide a new concourse two and a half times the size of the existing one. The airport has provided £30 million of funding for the scheme, which it says will transform the passenger experience at the station. Guy Stevenson, the airport's Chief Commercial Officer, told the New Civil Engineer UK Rail Conference that the airport is aiming to increase the amount of air travellers arriving by public transport from its current 42% to 60%. He added that its rail share now stands at a record 36%, which it aims to grow to 50%.
机译:即使政府不批准新跑道的建造,盖特威克机场火车站的重建工作也将继续进行。耗资1.205亿英镑的车站计划将提供一个新的大厅,是现有大厅的两倍半。机场为该计划提供了3000万英镑的资金,据称它将改变车站的乘客体验。机场首席商务官盖伊·史蒂文森(Guy Stevenson)在英国新土木工程师铁路大会上说,该机场的目标是将乘坐公共交通工具的航空旅客数量从目前的42%增加到60%。他补充说,其铁路份额现在达到创纪录的36%,并将目标提高到50%。

著录项

  • 来源
    《Modern Railways》 |2015年第803期|17-17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号