SUNDERLAND DOCKS loaded its first revenue-earning freight train in two decades on 22 June. DB Cargo Class 60 No 60015 hauled 21 wagons of steel coil imported by customer Marcegaglia and bound for its Wolverhampton terminal. Further trains were expected to run after the inaugural departure. The rail link to the port was reactivated in 2015 in a £600,000 investment, but traffic has been slow to build. Sunderland City Council has invested heavily in improved transport links to the port, and it hopes regular flows will operate from it.
展开▼
机译:桑德兰码头于6月22日在二十年中加载了第一列收入的货运火车。 DB Cargo Class 60 No 60015拖欠21辆由客户Marceglia进口的钢卷,并绑架其Wolverhampton终端。 预计就在就职出发后进一步的列车。 港口的铁路链接于2015年重新激活,以600,000英镑的投资,但交通速度缓慢。 桑德兰市议会已经在港口改进的运输环节上投入了大量投资,并且希望定期流动将从其中运营。
展开▼