首页> 外文期刊>Modern Railways >THECASTLEFIELD CONUNDRUM
【24h】

THECASTLEFIELD CONUNDRUM

机译:Thecastlefield康宁

获取原文
获取原文并翻译 | 示例
           

摘要

One major challenge facing Network Rail's new Managing Director, North West and Central, Tim Shoveller, is the situation in central Manchester, where the opening of the Ordsall chord and the introduction of a new timetable led to a collapse in performance through the Castlefield corridor, leading west from Manchester Piccadilly's through platforms 13 and 14. Mr Shoveller comments:'There are options in terms of what we do now and in terms of what we do in the medium term. Those options have to align with other options like the TransPennine Route Upgrade, Leeds station and HS2.
机译:网络轨道新董事总经理,蒂姆·斯普洛克(Tim Shoveller)的一项重大挑战是曼彻斯特中部的局势,曼彻斯特和弦开放,并引入新的时间表导致通过Castlefield走廊进行性能崩溃,来自曼彻斯特皮卡迪利的西方通过平台13和14. Mr Shoveller评论:“在我们现在的工作方面以及我们在中期所做的方面存在选择。这些选项必须与其他选项保持一致,如Transpennine Route Upgrade,LEEDS Station和HS2。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号