The new timetable introduced on 20 May was set to usher in the first of four enhancements to the cross-London Thameslink service. Over the coming 18 months, the network will expand so it eventually provides 24 trains per hour (tph) through the core section between Blackfriars and St Pancras at peak times.
展开▼