首页> 外文期刊>Modern Materials Handling >Master Control Panel Links Shipping And Receiving
【24h】

Master Control Panel Links Shipping And Receiving

机译:主控制面板链接运输和接收

获取原文
获取原文并翻译 | 示例
       

摘要

When Italian immigrant John Sanfilippo started his business in 1922, he probably never imagined that his pecan shelling operation would become this country's fastest growing nut processor and packager. John B. Sanfilippo & Son recently completed a move to a larger building in Elgin, 111. The facility-echoing the company's drive for greater safety and efficiency-reflects the latest in roasting, handling and packaging techniques. Even the dock area does its job in making this 1.65-million-square-foot facility function as a cohesive system, and the new master control panel coordinates the operation of each fully outfitted shipping and receiving dock.
机译:当意大利移民约翰·桑菲利波(John Sanfilippo)在1922年开始经营业务时,他可能从未想到过他的山核桃脱壳业务将成为该国发展最快的坚果加工商和包装商。 John B. Sanfilippo&Son最近完成了搬迁至111埃尔金的一栋较大建筑的过程。该设施呼应了公司追求更高安全性和效率的动力,体现了最新的烘烤,处理和包装技术。甚至码头区也发挥了作用,使这个165万平方英尺的设施起到了凝聚力的作用,新的主控制面板可协调每个装备齐全的运输和接收码头的操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号