首页> 外文期刊>The MJ >DCLG on defensive after critical Gateway report
【24h】

DCLG on defensive after critical Gateway report

机译:关键网关报告发布后,DCLG采取防御措施

获取原文
获取原文并翻译 | 示例
           

摘要

The DCLG has defended its handling of the multimillion-pound Thames Gateway regeneration project. A report by the public accounts committee claimed the Whitehall department was not up to the job of handling regeneration of the 40-mile stretch from Canary Wharf to the mouth of the River Thames. 'The department has not yet established the basic arrangements for controlling the programme including - incredibly - a budget,' said committee chairman, Edward Leigh. 'Crucial to the enterprise's success will be a full and co-ordinated contribution by Whitehall departments but, like a child clamouring for the attention of bigger classmates, it does not have the influence to make this happen.' But a DCLG spokesman said the report was 'already out-of-date'.
机译:DCLG捍卫了其对价值数百万英镑的泰晤士河门户再生项目的处理。公共会计委员会的一份报告称,白厅部门没有完成从金丝雀码头到泰晤士河河口40英里长的再生工作。委员会主席爱德华·利(Edward Leigh)说,该部门尚未建立控制该计划的基本安排,包括-令人难以置信的预算。 “对企业的成功至关重要的是,白厅部门将做出全面而协调的贡献,但是,就像一个孩子大声呼吁更大的同学们注意一样,它没有实现这一目标的影响力。”但DCLG发言人表示,该报告“已经过时”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号