首页> 外文期刊>Mine water and the environment >Physical Simulation of Water Inrush through the Mine Floor from a Confined Aquifer
【24h】

Physical Simulation of Water Inrush through the Mine Floor from a Confined Aquifer

机译:承压含水层通过矿层底板突水的物理模拟

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A physical simulation test system was designed to study the mechanism of water inrush through the mine floor. The results showed that vertical stress in the floor first increased as the mining face approached, then decreased after the face had passed, and finally returned to near its original state as the mine roof falls. At about the same time, the floor first experienced compression as the mining face approached, then heaving after the face had passed, and finally recompression to a position that was a little higher than its original height. Water inrush occurred before the first weighting of the roof but there were no subsequent water inrushes.
机译:设计了物理模拟测试系统来研究通过矿井底板突水的机理。结果表明,底板的垂直应力首先随着采煤工作面的靠近而增加,然后在采煤工作面通过后减小,最后随着矿井顶板的下落而恢复到其初始状态。大约在同一时间,当采掘工作面接近时,地板首先受到压缩,然后在工作面通过后发生沉陷,最后再压缩至比其原始高度稍高的位置。在屋顶第一次加重之前发生了突水,但随后没有突水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号