首页> 外文期刊>Mill Trade Journal's Recycling Markets >Cooperative Board Moves Forward On Recycling Plant
【24h】

Cooperative Board Moves Forward On Recycling Plant

机译:合作委员会推进回收工厂的发展

获取原文
获取原文并翻译 | 示例
           

摘要

The board governing the cooperative that handles trash for Concord, Laconia, Franklin and 24 surrounding New Hampshire towns has approved moving forward with a plan to build a recycling facility, reported The Concord Monitor. The $ 11 million plant would be built in Concord or Franklin and would use "single-stream" technology, which means all recyclables would be put in the same bin and then sorted on conveyors belts at the facility.
机译:据《协和显示器》报道,负责为康科德,拉科尼亚,富兰克林和新罕布什尔州24个城镇的垃圾处理合作社的理事会已批准推进建设回收设施的计划。这家耗资1100万美元的工厂将在康科德或富兰克林建造,并使用“单流”技术,这意味着所有可回收材料都将被放入同一个垃圾箱,然后在工厂的传送带上分类。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号