首页> 外文期刊>Military & Aerospace Electronics >Contractor protests could hold up Navy CANES shipboard networking program until December
【24h】

Contractor protests could hold up Navy CANES shipboard networking program until December

机译:承包商抗议活动可能会推迟海军CANES舰载网络计划,直到12月

获取原文
获取原文并翻译 | 示例
       

摘要

An important multi-billion-dollar U.S. Navy project to upgrade the command, control, communications, computers, intelligence (C4I), and networking equipment aboard the nation's surface warship fleet is being held up for as long as three months due to contractor protests. The protests involve contracts awarded last month worth as much as $2.53 billion over the next eight years to manufacture equipment for the Navy Consolidated Afloat Networks and Enterprise Services (CANES) shipboard networking program.
机译:由于承包商的抗议活动,一项耗资数十亿美元的重要美国海军项目被搁置了长达三个月之久,该项目旨在升级该国水面舰队的指挥,控制,通信,计算机,情报(C4I)和网络设备。抗议活动涉及上个月授予的合同,在接下来的八年中,该合同价值高达25.3亿美元,为海军联合漂浮网络和企业服务(CANES)舰载网络计划制造设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号