首页> 外文期刊>Metal bulletin monthly >First Quantum cuts 2010 output target, warns of drop next year
【24h】

First Quantum cuts 2010 output target, warns of drop next year

机译:First Quantum削减2010年产量目标,警告明年产量下降

获取原文
获取原文并翻译 | 示例
           

摘要

First Quantum has lowered its full-year copper production forecastand expects output to fall again nextyearon a string of disruptions in its African mining operations.rnThe news came as the company said it will start nickel production at its Ravensthorpe project next year, with the commissioning planned forthe second half of the year.rnFirst Quantum expects to produce 322,000 tonnes of copperrnin 2010, which is some 10.5% lower than the 360,000-tonne forecast the company gave in July.rnIt is also significantly below output of 373,940 tonnes in 2009.
机译:First Quantum降低了其全年铜产量预测,并预计明年非洲的一系列采矿业务中断后产量将再次下降。该消息是该公司表示将在明年的Ravensthorpe项目中开始镍生产,并计划调试First Quantum预计2010年铜产量为322,000吨,比该公司7月份的360,000吨的预测要低约10.5%。rn该产量也大大低于2009年的373,940吨。

著录项

  • 来源
    《Metal bulletin monthly》 |2010年第10期|p.11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号