...
首页> 外文期刊>Maritime Journal >Modern Bridge Maintains Heritage Style
【24h】

Modern Bridge Maintains Heritage Style

机译:现代桥保持传统风格

获取原文
获取原文并翻译 | 示例

摘要

Faced with a failing jack-arch bridge over the Birmingham Canal in Smethwick, Sandwell Borough Council and their engineering consultants Jacobs UK Ltd have opted for a radical solution.rnA Matiere pre-cast concrete arch from ABM Design and Build has been installed alongside a century old brick arch structure and an earlier Brindley designed bridge of 1772. The new bridge spans the canal and towpath and is sympathetic in profile and external finish to the earlier structures. The new bridge completes arnprogramme of works to upgrade bridge decks in the area to meet EU Directive 89/460/EEC for conveying 40 ton trucks. A council survey in 1994 found the olderrnbrick bridges satisfactory, but serious deficiencies in the main beam of the jack-arch extension. These deficiencies were remedied, but a recent resurvey by Jacobs found substantial deterioration and a decision was made to design a replacement for the failed bridge section while retaining the older, but sound, brick arch bridges.
机译:面对史密斯威克郡伯明翰运河上的一座不可靠的千斤顶拱桥,桑德威尔自治市议会及其工程顾问雅各布斯英国有限公司选择了一种根本性的解决方案。旧的砖拱结构和更早的Brindley设计的1772年桥梁。新桥横跨运河和牵引道,在轮廓和外部饰面上都与早期的结构相同。新桥完成了用于升级该地区桥面的工作计划,以符合用于运输40吨卡车的欧盟指令89/460 / EEC。 1994年的一项理事会调查发现,较旧的砖砌桥令人满意,但杰克拱延伸的主梁存在严重缺陷。这些缺陷已得到纠正,但雅各布斯最近进行的一次调查发现,情况已大大恶化,因此决定在保留较旧但稳固的砖砌拱桥的同时,设计出故障桥段的替代品。

著录项

  • 来源
    《Maritime Journal 》 |2008年第239期| 42| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号