...
首页> 外文期刊>Maritime Journal >Planning consent for four Scottish windfarms
【24h】

Planning consent for four Scottish windfarms

机译:四个苏格兰风电场的规划同意书

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The scottish government has awarded planning consent for four offshore wind projects with a potential total capacity of 2.28GW. The Firth of Forth Zone is one of UK's Round 3 development zones and is being developed by Seagreen Wind Energy Ltd, a joint venture between SSE and Fluor. Overall, the zone (around 25km east of Fife) has a potential capacity of 3.5GW and planning consent has now been granted for Projects Alpha and Bravo, Phase 1 of the zone. The two windfarms will see up to 150 turbines with a potential capacity of 1,050MW.
机译:苏格兰政府已批准了四个海上风能项目的规划同意书,这些项目的潜在总容量为2.28GW。峡湾区是英国第3轮开发区之一,由上证所与福陆公司合资成立的Seagreen Wind Energy Ltd正在开发。总体而言,该地区(法夫以东约25公里处)的潜在容量为3.5GW,现已批准该地区第一阶段的Alpha和Bravo项目的规划同意。这两个风电场将容纳多达150台涡轮机,潜在容量为1,050MW。

著录项

  • 来源
    《Maritime Journal》 |2014年第320期|27-27|共1页
  • 作者

    PETER BARKER;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号